All sourcing videos

Meet the Foshan project team

From your brief to drawings, materials and factory production: meet the team coordinating cabinetry, wardrobes and furniture from Foshan.

0:29 · English narration with subtitles · Our team

About this film.

From your brief to drawings, materials and factory production: meet the team coordinating cabinetry, wardrobes and furniture from Foshan.

The agreed drawings, materials, product scope and destination arrangements define your own order.

What you see in this video

Sampled moments in the film. Times are approximate landmarks.

  1. 0:04

    A finish library fills the frame, establishing the range of visible choices that the team and customer can use during a selection discussion.

  2. 0:07

    A staff member works at a computer in the office. The shot introduces the people involved in translating a brief into product details.

  3. 0:11

    A cabinet model is visible on a screen, showing a drawing-related task rather than a promise that a particular customer layout has been approved.

  4. 0:18

    Visitors and the team stand beside material displays. Their discussion is shown visually, without publishing the contents of their private project conversation.

  5. 0:25

    The sequence moves from upholstery swatches back to technical drawing work, connecting furniture material choices with the information needed for production.

Why it matters for your project

The useful connection is between the person discussing your brief, the sample being selected and the drawing that records the decision. Keep those references together so a changed finish or dimension does not become an informal instruction that someone misses. For your project, agree who approves revisions, which product categories the team coordinates and what information the local measuring and installation team needs before manufacture begins.

Questions about this film

Does the film show a customer’s complete specification?

No. The film shows people, samples and drawing work; your own approved specification should identify the dimensions, material references and revisions to be used for production.

What should I send before speaking to the team?

A product list or plan, your destination and project stage. Identify the choices still open so the team can focus the discussion on materials, dimensions and supply responsibilities.

Transcript.

Foshan offers endless furniture choices. But choice isn’t the hard part. Making every decision work together is.

That’s where NOVARTE comes in. We turn your brief into drawings, materials, and factory production.

Cabinetry, wardrobes, sofas, loose furniture. We coordinate every detail, whether you work remotely or come to Foshan.

Send us your floor plan or product list. We’ll build the sourcing plan around your project.